The list, the calendar and the timeline
The same cards as a list, on a month calendar or as bars on a timeline — and how to move dates by dragging.
Every view shows the same cards; a change in one is in all of them at once, for everyone who has the project open.
The list
List shows the cards as rows, grouped by column, with their people, labels and dates. Tick several to complete them together.
The calendar
Calendar shows a month. Drag a card to another day to move its due date. This project shows this project's cards; All my projects adds your cards from the others. Today brings you back to the current month.
The timeline
Timeline draws each card with a start and a due day as a bar:
- drag a bar to move both dates; drag one edge to change only the start or the end;
- drag the dot at the end of a bar onto another card to say that card waits for this one (Blocked by);
- a milestone is a diamond — mark a card as one in its Actions;
- Group by column, by label or not at all, and switch between Days and Weeks.
With the keyboard: select a bar, then ← and → move it by a day (with Shift, its end), and Enter opens the card.